Commit Graph
5 Commits
Author SHA1 Message Date
openhands e70b96e3a7 feat(renovate): add self-hosted Renovate config and Gitea Actions workflow
Run the pinned renovate/renovate image on the host runner every weekday at
04:17 (plus workflow_dispatch) against the gitea platform, authenticating with
the renovate-bot RENOVATE_TOKEN Actions secret. Minor and patch updates are
grouped and automerged only after CI passes; majors wait for dashboard
approval. Document the bot, secret rotation and the minimumReleaseAge policy in
the error-centre runbook.
2026-10-16 16:57:02 +02:00
openhands d9ef7f8360 chore(ci): remove Renovate
Dependency updates are handled manually, so the scheduled Renovate job
only cost a daily privileged Docker run on the deploy host. The empty
cache directory it maintained is gone too, and the operations note now
records that updates are manual instead of describing bot behaviour.
2026-09-27 19:15:31 +02:00
Simo 00e33623f7 feat(devops): diagnose slow HK requests and dependency timings 2026-09-11 09:48:19 +02:00
openhands ecadef904d chore: remove knip, husky and lint-staged
Drop the unused knip dead-code check and the husky+lint-staged pre-commit hook pipeline. All checks remain covered by the CI workflow (lint, typecheck, i18n, tests).
2026-09-08 16:56:55 +02:00
Simo 816e3875c2 feat(admin): add production error center and refresh CMS dependencies 2026-09-05 19:53:09 +02:00